Prototype Plating Line

SelectConnect Technologies has upgraded our capability to produce prototypes and small volume production runs by building a new prototype line. Now fully enclosed in a laboratory, the prototype line has a series of 15-gallon tanks which will support electroless copper, electroless nickel, and immersion gold along with the other required pretreatment and surface activation steps. The lab is fully ventilated and the tanks have heat, filtration, air agitation, and workrod agitation. The new prototype line will be operational by February 1, 2015.